Alderlea T5 Instrucciones de operaciones Pagina 18

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 17
18
ALT5.ASCINSB 150714-24
©PACIFIC ENERGY FIREPLACE
PRODUCTS LTD.
is important to prevent damage to wires.
Surround Assembly and Installation
1) Remove crate and all plastic packaging.
8) Route cable from speed control to fan and reattach wire support
tabs on the underside of the ash lip. Note wire positions.
(Fig.26 & Fig.27)
9) Reconnect the wires to the fans (Fig.28) and re-attach thermal
snap switch (Fig.29). Re t ash lip, sides and top. Ensure that
the power cable is correctly routed through the surround and
it is not touching the  rebox side (Fig #30). Wire placement
WIRE SUPPORT TABS
Fig. # 25
Fig. # 26
Fig. # 27
Fig. # 30
Fig. # 28
Fig. # 29
ASHLIP BRACKETSPEED CONTROL
THERMAL
SWITCH
Vista de pagina 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 24

Comentarios a estos manuales

Sin comentarios